3 Tier Raised Garden Bed Plans

What’s occurring guys and welcome again to a different submit of DIY: 3-Tier Raised Garden Bed. Today I’m gonna present you guys the right way to construct just about your personal DIY 3 tier planter. My spouse noticed one thing on Pinterest received an thought and ran with it. OK effectively as you possibly can think about, I needed to construct it.

3 tier raised garden bed plans

I do not like taking different individuals’s designs, so I made a decision to provide you with one thing myself and we got here up with this and whole this value lower than $100 to construct. It takes proper round an hour to place collectively. If you are okay with some instruments, now within the description beneath:

Materials Needed for construct 3-Tier Raised Garden Bed:

– (6) 2x8x10 – https://www.homedepot.com/p/2-in-x-8-…

– (1lb) T25 3″ Deckmate Screws: https://www.homedepot.com/p/Deck-Mate…

______

Optional Materials Needed [ If doing the 2×4 Cap Railing + Plywood Bottom in Middle and Top Box]:

– (5) 2x4x8 [For the 45° Cap]- https://www.homedepot.com/p/2-in-x-4-…

– (2) 1x2x8 [Ref. 9:02] – https://www.homedepot.com/p/1-in-x-2-…

– (1) 4x8x1/2 Plywood [Ref. 9:59] – https://www.homedepot.com/p/Sheathing…

– (1lb) T20 2″ Deckmate Screws: https://www.homedepot.com/p/Deck-Mate…

_______________________

Cut List:

Box #1 –

(2) 2×8 @ 96″

(3) 2×8 @ 24″

Box #2 –

(2) 2×8 @ 48″

(3) 2×8 @ 24″

— If you are doing plywood bottoms, lower these beneath as effectively. —

(2) 1×2 @ 23-1/2″ [These are used like I did at 9:02]

(2) 1×2 @ 20″ [These are used like I did at 9:02]

(1) 22-1/4″ x 23-3/4″ Plywood Base [Reference 9:59]

Box #3 –

(4) 2×8 @ 24″

— If you are doing plywood bottoms, lower these beneath as effectively. —

(2) 1×2 @ 23-1/2″ [These are used like I did at 9:02]

(2) 1×2 @ 19-1/4″ [These are used like I did at 9:02]

(1) 20-3/4″x23-3/4″ Plywood Base [Reference [9:59]

————

Optional 2×4″ Cap [Seen at 13:05]

(#’s given are measured on longest level of 45°)

[The dimensions below will give you a 1″ overhang around the whole planter]

Box #1 – [Bottom]

(2) 2×4 @ 49″ lengthy level of a forty five° [Square on one end, 45° on the other]

(1) 2×4 @ 29″ lengthy level to lengthy level of a forty five°

Box #2 – [Middle]

(2) 2×4 @ 25″ lengthy level of a forty five° [Square on one end, 45° on the other]

(1) 2×4 @ 29″ lengthy level to lengthy level of a forty five°

Box #3 – [Top]

(2) 2×4 @ 29″ lengthy level to lengthy level of a forty five°

(2) 2×4 @ 26″ lengthy level to lengthy level of a forty five°

Pre-assemble these first, drop them in place, evenly house them 1″ from the skin of planter field and screw them down into the 2×8 of the planter.

__________________________

Did you utilize this DIY information to construct your personal DIY 3-Tier Planter Box? E-mail me pictures, I’d LOVE to see them!

__________________________

Tools used for construct 3 tier raised backyard mattress plans

  • Skilsaw 54V
  • Makita 18V Drill
  • Tape Measure
  • Speed Square

I’ve a full detailed listing on what you want with a view to construct this and a little bit bit later within the Post. I’m going to have a full on lower listing you possibly can copy each single merchandise down lower them your self and comply with alongside step-by-step as we construct your personal little DIY planter.

How to construct a 3 raised backyard mattress Plans For a Balcony

Now with a view to construct this planter you do not want very many instruments in any respect you want a noticed. You want a drill of some kind so now lots of these movies, showcase individuals utilizing a miter noticed it will get cleaner lower. so it takes loads longer, but when that is what you are comfy with utilizing go proper forward and use a miter noticed.

I’m very comfy with the previous seven and 1 / 4 ability noticed. that is what I’m going to make use of for the drill. I’ve an 18 volt brushless Makita with a 5.0 battery, the 5.0 battery took one bar out of 4 to construct this entire factor. you do not want very many screws both now. we have got a 5 pound field of deck mate screws, these are three-inch t25 bit after which the identical screws in a two inch that is a t20 bit.

You’re gonna want two bits to construct it as effectively. now you do not want the entire five-pound field to construct this factor you may get a one-pound field. If you need I had these becoming within the store although so it is what I used however let’s dive proper in guys. I’m going to point out you step-by-step on the right way to construct this factor and the right way to put it collectively and hopefully by the tip of this text you possibly can comply with alongside and make it your self.

Go forward and hit that subscribe button Post down beneath if you have not already you can even click on the I card within the prime proper hand nook to take a look at my web site. Where we construct customized properties begin to end let’s get to it. so we have got our field invoice that is our base right here now we have yet one more block left that I’m going to point out you the place that goes proper now.

That block is just about solely right here that will help you save on soil you do not wish to fill this entire factor in the event you’re gonna have one other field on prime of it making all this again right here unusable. this block right here goes to go proper the place the second field stacks on prime and that is gonna make it to the place you solely need to fill with soil the half that is usable. This is the 4 footer for our subsequent run.

We’re gonna set it up there flush to the again facet and simply mark proper the place the tip of it’s one other approach you are able to do it, as a result of we all know that the following run is simply 4 foot you possibly can simply take it mark 4 foot down. I like to make use of the opposite piece so simply to guarantee that it’s in the appropriate spot guarantee that it is good and sq. I’m gonna put in our backside screw right here.

It’s completed so now that the massive one is completed we’re gonna work on the 2 smaller ones. When we construct the middle one first after which work our approach as much as the highest, however we received to get this out of the way in which first. it is not the identical factor that we simply did with the final part. Hey! do I assist me so that you maintain that one up okay, stand proper right here you possibly can sit if you would like you gonna sit down and you may maintain that, alright so the identical factor that we did with the larger field.

We’re gonna do with a smaller field as effectively two footer goes in between the facet items three screws down each side and we’ll end this factor out are you leaving me AUB’s. bye, thanks for the assistance, it is quiet. I see quiet that one was loud you are doing good so that is our subsequent part that is the 24 that goes within the very prime we’re gonna set this flush to the again right here and simply give ourselves one little mark proper there after which we’re gonna put this block just like what we did on the bottom proper there so solely this will get soil in right here and you do not have to waste any within the again hop in it is a swimming pool after which we’re gonna do the identical factor.

Here we’re gonna flush up that again facet and and Mark proper on the finish of it. that is the place our block is gonna go now. we’re gonna screw that block in ensure that it is flush on the prime if you should throw a sq. on to guarantee that. it is straight up and down wee-ha.it is a little bit pony and now we’re gonna screw this facet and now this field is completed.

We received to maneuver this now okay decide up your finish alright, so now now we have one final field to construct it is the smallest one. Goes proper on prime swimming pool, now we have our 424 chair proper. Two on the outsides two within the center screw all of them collectively and we’re dying, I do know this final step is optionally available earlier than we put the packing containers collectively, it is a 1 by 2 trim going all the way in which round. the explanation we do it’s because we’re gonna drop a sheet of plywood in right here, making this little field separate that approach we do not have to fill all the way in which beneath it .

We took this one by to trim and Boxtel all the way in which alongside the underside of this field and this one right here. and the explanation we did that’s tour we will drop some plywood in right here, so we solely need to fill 8 inches of soil reasonably than 24. it is gonna prevent fairly a bit on the subject of shopping for your soil. We’re onto our final and remaining steps on the subject of constructing this factor now we have our base right here.

We have our center and our prime piece, OK it is time to assemble every thing. we’re gonna go forward and get the center on right here. Then get that screwed down then do the highest. now we wish to guarantee that this par. right here is in the direction of the entrance. When you set the packing containers on prime of one another, the one factor you should fear about is being flush right here right here and on the perimeters. this facet over right here is sweet on each, so I’m gonna go forward and screw this after which we’ll work that different facet.

We’re simply gonna put one down on an angle like that, the place it catches the underside so you possibly can see that this backside block labored out fairly good. this runs good and steady all the way in which down we’re gonna go forward and screw in right here now the one factor we’d like to verify of is that we’re flush on each side so now you possibly can see the quantity of soil you are going to save this entire part right here all the way in which down and beneath you would need to fill which might take fairly a bit now this field goes to be the identical approach we wish to ensure that we’re flush right here and right here now it is excellent to final screws the one factor we’d like to verify if is we’re flush on the skin so we have got the highest space up right here you can plant within the center space after which the larger part right here on the underside the blocks that we put in right here and right here stop you from having to fill in all the way in which down and all the way in which over